PlanLocal - Civicplan

PlanLocal Voting List

The following is the full voting list of PlanLocal Ward 2 Safe Streets projects.

Councillor Farr is making $1,000,000 available for safe streets projects during the PlanLocal process.  To provide context for your choices, the following project cost estimate ranges have been included.

$ = $1000-10,000    $$= $10,000-100,000    $$$= $100,000-250,000

  1. Augusta and Walnut $$

    Build a new pedestrian crossover across Walnut St. to increase safety for pedestrians travelling to Shamrock Park.

  2. Barton and James $$

    Redesign the intersection to improve sight lines between James St. and Barton St.

  3. Barton and MacNab $$

    Upgrade the existing intersection with an enhanced all-way stop, including ladder crossings.

  4. Burlington and James $$$

    Install a three-phase traffic signal across James St. to create a safer crossing for pedestrians and cyclists.

  5. Cannon and Mary $$

    Install a ladder crossing and additional signage on Mary St. to make a safer crossing for eastbound pedestrians and cyclists.

  6. Caroline and Charlton $$

    Build a new pedestrian crossover across Charlton Ave. to increase safety for pedestrians.

  7. Charlton and James $

    Install ladder crossings and improve signage at the intersection to make a safer pedestrian crossing in both directions, including the south side of Charlton Ave.

  8. Emerald and Stinson $$

    Install a speed table (raised pedestrian crossing that brings the road to curb level) across Stinson St.

  9. Ferguson and Hunter $$

    Build a new pedestrian crossover across Hunter St. to increase safety for pedestrians.

  10. Ferguson and Main $$$

    Install a three phase traffic signal across Main St. to create a safer crossing for pedestrians and cyclists.

  11. Ferrie and MacNab $$

    Upgrade existing intersection to an enhanced all-way stop, including ladder crossings.

  12. Forest and John $$$

    Install a three phase traffic signal across John St. to create a safer crossing for pedestrians and cyclists.

  13. Grant from Stinson to Main $$

    Install 3 speed humps on Grant Ave. to slow down traffic.

  14. Herkimer and Hess $$

    Build a new pedestrian crossover across Herkimer St. to increase safety for pedestrians.

  15. Hunter and Park $$

    Build a new pedestrian crossover across Hunter St. to increase safety for pedestrians when walking to City Hall.

  16. James and Mulberry $$

    Build a new pedestrian crossover across James St. to increase safety for pedestrians.

  17. James and Robert $$

    Upgrade existing intersection with a new pedestrian crossover across James St. to increase safety for pedestrians.

  18. James and Robinson $

    Improve signage and restrict left-hand turns from Robinson St. onto James St. to improve safety at this intersection.

  19. Mary and Wilson $$$

    Install a three phase traffic signal across Wilson St. to create a safer crossing for pedestrians and cyclists.

  20. Murray from James to Bay $$

    Install two speed humps along Murray St. to slow down traffic.

  21. NHCHC (Picton St.) Path $$

    Upgrade the pathway at the North Hamilton Community Health Centre (NHCHC) by paving and improving the current pathway connecting Picton St. between Hughson St. and John St.

  22. Picton at Hughson and John $$

    Upgrade intersections on Picton St. at Hughson St. and John St. with enhanced all-way stops, to improve access to the NHCHC and Bennetto and St. Lawrence Schools.

  23. Stinson Bike Lanes $$$

    Repair the bike lanes on Stinson St. by resurfacing the street from Wellington St. to Wentworth St.

  24. Stinson and Wellington $$

    Upgrade existing intersection to a pedestrian crossover across Wellington St. to increase safety for pedestrians.